{"id":2088,"date":"2026-11-19T07:10:36","date_gmt":"2026-11-19T07:10:36","guid":{"rendered":"https:\/\/sykj-sh.com\/raised-access-floor-antistatic-selection\/"},"modified":"2026-11-19T07:10:38","modified_gmt":"2026-11-19T07:10:38","slug":"raised-access-floor-antistatic-selection","status":"publish","type":"post","link":"https:\/\/sykj-sh.com\/ru\/raised-access-floor-antistatic-selection\/","title":{"rendered":"Raised Access Floor and Antistatic Flooring: Selection Notes"},"content":{"rendered":"<p><strong>A raised access floor is a system, not a tile.<\/strong> Panel, stringer, pedestal and finish decide whether the floor stays level after five years of loaded cabinets and repeated access.<\/p>\n<h3>Panel construction<\/h3>\n<p>Steel-encapsulated cementitious panels at 600 x 600 x 35 mm are the standard for data rooms and offices; solid steel panels are used where point loads are high. For antistatic applications the finish is HPL or conductive vinyl with a surface resistance in the 10^6-10^9 ohm range, bonded to the panel core rather than laid loose.<\/p>\n<h3>Load class<\/h3>\n<p>State concentrated load and ultimate load &#8211; for example 1200 kgf\/m2 uniformly distributed with a 300 kg point load at the panel centre. Rooms with UPS and battery cabinets usually need the next class up, and pedestal spacing must match.<\/p>\n<h3>Support height and stringers<\/h3>\n<p>Finished floor height follows the cable and air path underneath: 600 mm is common for data rooms, 300-500 mm for offices. Stringers connect pedestals and reduce panel rocking; bolted stringers are preferred where the floor is accessed often.<\/p>\n<h3>Ventilation<\/h3>\n<p>Perforated panels are specified by open area &#8211; 35 percent for cold aisle delivery, 17-25 percent for general rooms. Confirm how many perforated panels sit in the layout and that airflow matches the cooling capacity.<\/p>\n<h3>Finishing and edges<\/h3>\n<p>Check edge sealing, corner locking and tolerance between panels. A floor that reads well on a drawing can still rock when levelling is not specified and installation is not supervised.<\/p>\n<p>Send the room size, cabinet layout and required finished height for a panel schedule and pedestal count. <a href=\"https:\/\/wa.me\/8613636369630\">WhatsApp<\/a> \u00b7 zhangxt@sykj-sh.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Panel type, load class, finish and support height: how to specify a raised access floor for data rooms and clean spaces.<\/p>","protected":false},"author":1,"featured_media":2087,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2088","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/posts\/2088","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/comments?post=2088"}],"version-history":[{"count":1,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/posts\/2088\/revisions"}],"predecessor-version":[{"id":2089,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/posts\/2088\/revisions\/2089"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/media\/2087"}],"wp:attachment":[{"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/media?parent=2088"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/categories?post=2088"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sykj-sh.com\/ru\/wp-json\/wp\/v2\/tags?post=2088"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}